In the frame of the BIDUCOR project an upgrade of ESR beam instrumentation is necessary, too. Goals of these upgrade activities are:

  • modernization of the equipment
  • standardization of technical solutions, e.g. usage of LIBERAs for BPMs etc.
  • required updates of the ESR BI to allow retrofit and CS restart in 2018
  • technical preparations for the full digital control room

25.02.2016, Discussion M. Steck, M. Schwickert

DC current transformer:

  • analogue signal must be available in HKR, required by experimentalists
  • only 2 measurement ranges are typically in use
  • DAQ upgrade similar to SIS18 should be foreseen

Mitschrift