User Tools

Site Tools


fair-rnd:experimental-area-htp:schematic-drawing

This is an old revision of the document!


Schematic Drawings of HTP Area

Existing beam line (up to June 2013)

Proposal for upgraded beam line (2nd July 2013)

The image below shows the detector setup for the 2014 measurement series. Not shown are in-air experiment setups like the sctintillating screen target ladder and two vertical actuators (pneumatic drive and stepper motor drive) with air ionisation chamber or multi-wire chamber.

Proposed detector configuration

Proposal C. Dorn, 2nd July 2013

Possible detector configurations for the FAIR HEBT chamber (type 3):

TOP SCR
LEFT SEM-Grid
RIGHT MWPC/IC/SEM combination or OTR
45° portPDC (Scintillator) or other position-insensitive detectors
Note: position interlock required with right port
fair-rnd/experimental-area-htp/schematic-drawing.1372875394.txt.gz · Last modified: 2013/07/03 20:16 by andreasreiter