Wiki
Wiki
Besides the detector mechanics and scintillating screen, a camera with lens system and connector box is installed at the beam line. Long cables (copper) lead to the DAQ and PLC systems.
If unavoidable, the PLC system for control of the lens system and LED can be mounted in a 19” rack system in the tunnel in radiation protected/reduced areas.
All components of the SCR DAQ system as well as the required PLC infrastructure should be installed in electronics rooms. They are mounted in 19” rack systems.
Long cables:
1x halogen free UNITRONIC S/FTP CAT7 LSZH 4x2xAWG23 network cable for camera data Signals
1x halogen free DATAFLAMM-C 5×0.14mm2 between PLC and Adapter box
1x halogen free DATAFLAMM-C PAAR 5x2x0.14mm2 between CPS8 and Adapter box
Short cables:
1x halogen free DATAFLAMM-C 5×0.14mm2 between Adapter box and lens
1x halogen free DATAFLAMM-C 2×0.14mm2 between Adapter box and LED
Long cables:
1x remote head cable, LS0H for camera data Signals
1x halogen free DATAFLAMM-C 5×0.14mm2 between PLC and Adapter box
Short cables:
1x halogen free DATAFLAMM-C 5×0.14mm2 between Adapter box and lens
1x halogen free DATAFLAMM-C 2×0.14mm2 between Adapter box and LED