User Tools

Site Tools


fair-rnd:rnd-projects:pbar

This is an old revision of the document!


Overview

This page summarises test measurements intended for the pBar target.






MEASUREMENTS AT EXTERNAL FACILITIES

HIT Measurements with Proton Beams

Type of investigations:

  • LEBT: Measurements with SEM grids
  • MEBT: Measurements with SEM grids
  • HEBT: Measurements with P43 screen, MWPC and IC to estimate lower detection limits
  • HEBT: Measurement of MWPC gas gain


Beam conditions:

  • Date : February 2011
  • Beam : Protons
  • Energy: 48 or 220 MeV
  • Beam lines: LEBT, MEBT, H1-H3


For more information download the following document:
Summary of HIT measurements


MEASUREMENTS AT GSI


HTP Measurement with CERN BLMS

Date : June 2010 and April 2011 Beam : Uranium, Argon, Carbon Beam line: HTP, in front of dump

ToDo:

  • Build DAQ for fast extraction
  • Measurement with fast extraction
  • Measurement with slow extraction (dedicated shift!): light, medium and heavy ions


HTP Measurement with SEM as air ionisation chamber

Date : November 2010 Beam : Uranium

ToDo:

  • Measurement with pulsed high voltage (signal of SEM emission in air without ionisation component)
  • Build segmented SEM for profile measurements
  • Measurements with fast and slow extraction




Return to pBar target main page

fair-rnd/rnd-projects/pbar.1322146317.txt.gz · Last modified: 2011/11/24 15:51 by frank