User Tools

Site Tools


fair-rnd:rnd-projects:pbar

Overview R&D for pBar Target Diagnostics

This page summarises test measurements intended for the pBar target.






MEASUREMENTS AT EXTERNAL FACILITIES

HIT Measurements with Proton Beams

Type of investigations:

  • LEBT: Measurements with SEM grids
  • MEBT: Measurements with SEM grids
  • HEBT: Measurements with P43 screen, MWPC and IC to estimate lower detection limits
  • HEBT: Measurement of MWPC gas gain


Beam conditions:

  • Date : February 2011
  • Beam : Protons
  • Energy: 48 or 220 MeV
  • Beam lines: LEBT, MEBT, H1-H3


For more information download the following document:
Summary of HIT measurements


MEASUREMENTS AT GSI


HTP Measurement with CERN BLMS

Date : June 2010 and April 2011 Beam : Uranium, Argon, Carbon Beam line: HTP, in front of dump

ToDo:

  • Build DAQ for fast extraction
  • Measurement with fast extraction
  • Measurement with slow extraction (dedicated shift!): light, medium and heavy ions


HTP Measurement with SEM as air ionisation chamber

Date : November 2010 Beam : Uranium

ToDo:

  • Measurement with pulsed high voltage (signal of SEM emission in air without ionisation component)
  • Build segmented SEM for profile measurements
  • Measurements with fast and slow extraction




Return to pBar target main page

fair-rnd/rnd-projects/pbar.txt · Last modified: 2012/02/16 16:08 by andreasreiter