Retrofit 2018 - ACTs and DCTs at TK, SIS18 and ESR

General

To prepare the existing GSI accelerators for usage at FAIR some outdated DAQ systems and software environments (VMS, NODAL) have to be replaced. This concerns the ACCT and DCCT installations at TK, SIS18 and ESR. Plan is to renovate the DAQ for those systems to FAIR standards. The old digitizing hardware will be replaced and the software integration of the new system will be in conformance with the FAIR control system. It is assumed, that with beginning of 2018 the required infrastructure for the FAIR control system is established and operational. This includes the FESA, LSA and application level and a White Rabbit timing system. The new transformer installation will replace the old device model DTX of the control system for SIS18.

Documents

Software-Specification: GSI-LOBI-2016-18-Retrofit_SIS18_BCT