Table of Contents

Collection of BI Projects in the Past

Years 2015 - 2016

Todo list from first meeting with CSCO on “Agenda 2017” (11 May 2015): todo list

At present various projects and activities require a substantial re-work of the existing BI equipment at GSI. The activities which require support by the BI team are:

Beam Instrumentation DAQ Upgrade and Control System Retrofit

Starting in Feb. 2016 a sequence of bi-weekly project meetings has been set up in order to organize and prepare for the required upgrade of diagnostic devices.
The working title of the project is for time being: BIDUCOR (Beam Instrumentation Data acquisition Upgrade and COntrol system Retrofit).
Apart from the preparation of presentations and meeting minutes the goal of the meetings is to collocate information on the various diagnostic systems and to generate a central document containing all relevant technical information about the required upgrade measures. At the moment it is foreseen to create two documents, one for BIDUCOR-SIS18 and one for BIDUCOR-HEST.

Special topics related to ESR Beam Instrumentation are collected here.

Meeting #1: 23.02.2016

Participants: HR, BWH, AR, PK, TG, TH, OC, MSchw
presentation slides with comments

Summary

Action Items

Meeting #2: 10.03.2016

Participants: WK, PF, BWH, AR, PK, TG, TH, OC, MSchw
presentation slides with comments

Summary

Action Items