====== ESR BI Upgrade ====== | ====== ESR BI Upgrade ====== | ||
In the frame of the BIDUCOR project an upgrade of ESR beam instrumentation is necessary, too. Goals of these upgrade activities are: | In the frame of the BIDUCOR project an upgrade of ESR beam instrumentation is necessary, too. Goals of these upgrade activities are: | ||
- | * modernization of the equipment | + | |
- | * standardization of technical solutions, e.g. usage of LIBERAs for BPMs etc. | + | * standardization of technical solutions, e.g. usage of LIBERAs for BPMs etc. |
- | * required updates of the ESR BI to allow retrofit and CS restart in 2018 | + | * required updates of the ESR BI to allow retrofit and CS restart in 2018 |
- | * technical preparations for the full digital control room | + | * technical preparations for the full digital control room |
===== 25.02.2016, Discussion M. Steck, M. Schwickert ===== | ===== 25.02.2016, Discussion M. Steck, M. Schwickert ===== | ||
- | * DC current transformer: | + | DC current transformer: |
- | ** | + | * analogue signal must be available in HKR, required by experimentalists |
+ | * only 2 measurement ranges are typically in use | ||
+ | * DAQ upgrade similar to SIS18 should be foreseen | ||
+ | * | ||
+ | |