User Tools

Site Tools


misc:epac2008

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
misc:epac2008 [2008/06/13 14:57]
marcusschwickert
misc:epac2008 [2010/02/01 21:52] (current)
Line 30: Line 30:
 {{epac2008_pgx_b1dg3g.png?400}}\\ {{epac2008_pgx_b1dg3g.png?400}}\\
 {{epac2008_pgy_b1dg3g.png?400}}\\ {{epac2008_pgy_b1dg3g.png?400}}\\
- 
  
  
Line 52: Line 51:
 **Diese Plots finde ich gut, wir sollten aber vielleicht nur die oberen nehmen, sonst finde ich es etwas unuebersichtlich, was meinst Du?** **Diese Plots finde ich gut, wir sollten aber vielleicht nur die oberen nehmen, sonst finde ich es etwas unuebersichtlich, was meinst Du?**
  
 +<color blue> Der 4-er Pack kam so zunächst aus meiner Analyse. Wir sollten uns vielleicht auf eine Ebene (SP X und FWHM X) beschränken und erwähnen, dass ähnliche Resultate für die andere Ebene. </color>
 ==== Paper: TUPC122 ==== ==== Paper: TUPC122 ====
 <color red>__Bei der Suche im Archiv wurde das Paper unter der folgenden Nummer TUPC095 gefunden?!?!__</color> <color red>__Bei der Suche im Archiv wurde das Paper unter der folgenden Nummer TUPC095 gefunden?!?!__</color>
Line 103: Line 103:
  
 === Conclusions and outlook === === Conclusions and outlook ===
-We have presented that the well-integrated beam diagnostic devices of HIT include essential tools for the whole commissioning process. Especially the beam diagnostic devices of the HEBT section are used for troubleshooting and fine-tuning of the HIT synchrotron, as well as tests and verification of the beam delivered to the treatment places. In order to verify the beam as needed for medical treatments the isocenter diagnostics has proven to be extremely useful. For an effective and time-optimized commissioning of this final part of the accelerator automated therapy protocols were implemented.+We have presented that the well-integrated beam diagnostic devices of HIT include essential tools for the whole commissioning process. Especially the beam diagnostic devices of the HEBT section are used for troubleshooting and fine-tuning of the HIT synchrotron, as well as tests and verification of the beam delivered to the treatment places. In order to verify the beam as needed for medical treatments the isocenter diagnostics has proven to be extremely useful. For an effective and time-optimized commissioning of this final part of the accelerator automated therapy protocols were implemented. These procedures will in the future be also part of routine checks when the HIT facility is in operation for patient treatment
  
  
misc/epac2008.1213361835.txt.gz · Last modified: 2010/02/01 21:35 (external edit)