User Tools

Site Tools


projects:bif-monitor:application

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projects:bif-monitor:application [2010/02/01 22:14]
127.0.0.1 external edit
projects:bif-monitor:application [2011/08/24 18:06] (current)
candre
Line 1: Line 1:
 ====== Current Application - BIF-Monitor @ UNILAC ====== ====== Current Application - BIF-Monitor @ UNILAC ======
  
-During the last years the BIF method was applied successfully at the GSI heavy ion LINAC for various ion species and energies between and 11.4 MeV/u. In 2009 four x-y BIF-Monitors with eight intensified camera systems in total will be installed at the UNILAC. Two cameras per BIF-station record beam profiles in horizontal and vertical direction (x,y):\\ +During the last years the BIF method was applied successfully at the GSI heavy ion LINAC for various ion species and energies between 1.4 and 11.4 MeV/u. 
-{{:projects:bif-monitor:ut_hor_ver_aufbau_80dpi.png|}}\\ +
-''X-Y orientated intensified cameras at UNILAC UT-1 station''+
  
-{{:projects:bif-monitor:x2-aufbau_72dpi.jpg|}}\\ +For non-intercepting beam profile measurements at UNILAC high current operation, four BIF monitors were istalled. Two cameras per BIF-station record beam profiles in horizontal and vertical direction (x,y):\\ 
-''BIF-Monitor with a motorized filter wheel and 10 nm narrowband interference filters for spectral investigation of nitrogen emissions at the UNILAC experimental cave X2''+\\ 
 +{{:projects:bif-monitor:bif_setup_new_small.png?600|}} \\ 
 +**BIF setup at UNILAC: Intensified cameras in horizontal & vertical direction** 
 +\\ 
 +\\
  
-===== Technical Drawings ===== +====== BIF setup locations ======
-==== Diagnostic Box UNI-DK 1130 ==== +
-{{:projects:bif-monitor:kammer_bif.jpg|}}+
  
-{{:projects:bif-monitor:std-000-l33.010.000_diagnosekammer.pdf|}}+{{:projects:bif-monitor:unilac_bif_new_3.png|}}  \\ 
 +**Four installed BIF monitors, two planned**     \\ 
 +\\
  
-{{:projects:bif-monitor:std-000-l33.010.000_diagnosekammer_stkl.pdf|}}+====== BIF spectral investigation ======
  
-==== Diagnostic Box UNI-DK 1131 ====+{{:projects:bif-monitor:x2-aufbau_72dpi.jpg?600|}}\\ 
 +**BIF-Monitor with a motorized filter wheel and 10 nm narrowband interference filters for spectral investigation of nitrogen emissions at the UNILAC experimental cave X2**
  
-{{:projects:bif-monitor:uni-dk_1131.jpg|}} 
- 
-{{:projects:bif-monitor:std-000-l33.015.000_diagnosekammer_stkl.pdf|}} 
- 
-{{:projects:bif-monitor:std-000-l33.015.000_diagnosekammer_uni-dk_1131.pdf|}} 
- 
-==== Linear Feedthrouh UNI-DL 1140 ==== 
-This feedthrouh is used for positioning the calibration tool on beam axis 
- 
-{{:projects:bif-monitor:unidl1140.jpg|}}{{:projects:bif-monitor:unidl1140_2.jpg|}} 
- 
-==== Calibration Tool ==== 
- 
-{{:projects:bif-monitor:bild1.jpg|}}{{:projects:bif-monitor:bild2.jpg|}} 
- 
-{{:projects:bif-monitor:std-000-l33.031.000_justiereinheit.pdf|}} 
- 
-{{:projects:bif-monitor:std-000-l33.031.000_justiereinheit_stkl.pdf|}} 
- 
-==== Assembly ==== 
- 
-**Linear Feedthrouh with Calibration Tool** 
-**UNI-DZ 1230** 
- 
-//STD-000-L33.000.000A// 
- 
-{{:projects:bif-monitor:uni-dz_1230.jpg|}} 
- 
-{{:projects:bif-monitor:std-000-l33.000.000a_lineardurchfuehrung_komplett_stkl.pdf|}} 
- 
-{{:projects:bif-monitor:std-000-l33.000.000a_lineardurchfuehrung_komplett.pdf|}} 
- 
- 
- 
- 
- 
- 
- 
- 
- 
-==== Camera Mounting and Covering ==== 
- 
-{{:projects:bif-monitor:kamerahalterung1.jpg|}} 
- 
-{{:projects:bif-monitor:std-000-l33.040.000_kamerahalterung.pdf|}} 
- 
-{{:projects:bif-monitor:std-000-l33.040.000_kamerahalterung_stkl.pdf|}} 
  
projects/bif-monitor/application.1265058871.txt.gz · Last modified: 2011/02/09 12:47 (external edit)