User Tools

Site Tools


projects:bif-monitor:application

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
projects:bif-monitor:application [2011/08/24 13:22]
candre
projects:bif-monitor:application [2011/08/24 13:57]
candre
Line 5: Line 5:
 For non-intercepting beam profile measurements at UNILAC high current operation, four BIF monitors were istalled. Two cameras per BIF-station record beam profiles in horizontal and vertical direction (x,y):\\ For non-intercepting beam profile measurements at UNILAC high current operation, four BIF monitors were istalled. Two cameras per BIF-station record beam profiles in horizontal and vertical direction (x,y):\\
 \\ \\
-{{:projects:bif-monitor:bif_setup_new_small.png|}} +{{:projects:bif-monitor:bif_setup_new_small.png|}} \\ 
-''X-Y orientated intensified cameras at UNILAC''+**BIF setup at UNILAC: Intensified cameras in horizontal & vertical direction** 
 +\\ 
 +\\
  
 ====== BIF setup locations ====== ====== BIF setup locations ======
-{{:projects:bif-monitor:unilac_bif_new_small.png|}}+ 
 +{{:projects:bif-monitor:unilac_bif_new_3.png|}}  \\ 
 +**Four installed BIF monitors, two planned**     \\ 
 +\\
  
 ====== BIF spectral investigation ====== ====== BIF spectral investigation ======
projects/bif-monitor/application.txt · Last modified: 2011/08/24 18:06 by candre