ds:projects:maps [2021/09/16 21:08]
tobiashoffmann [Project Plan:]
ds:projects:maps [2021/12/07 10:24] (current)
tobiashoffmann [Project Plan:]
Line 13: Line 13:
 The system will be splitted, so the old MAPS will be still usable, when the new MAPS will be ready for testing. This is true for the signals and not for the pre-amp power supply and range settings. The system will be splitted, so the old MAPS will be still usable, when the new MAPS will be ready for testing. This is true for the signals and not for the pre-amp power supply and range settings.
  
-The SÜV will not be touched. We need to make sure, that the pre-amp is always powered. SÜV signals will be converted into TTL pulses and offered to ACO.+The SVÜ will not be touched. We need to make sure, that the pre-amp is always powered. SVÜ signals will be converted into TTL pulses and offered to ACO.
  
 == Software Status: == == Software Status: ==
Line 29: Line 29:
 For the time being LSA @ UNILAC is not available. This has impact on automatic range settings. For the time being LSA @ UNILAC is not available. This has impact on automatic range settings.
 It is unclear, how many timing domains will be defined later and the consequences for the DAQ system.  It is unclear, how many timing domains will be defined later and the consequences for the DAQ system. 
-==  + 
-Hardware Status: ==+ 
 +== Hardware Status: ==
  
  