====== Yearly Clean Up ====== ===== Clean Up December 2011 ===== === Cable Chaos === * Old or unused cables were removed * Existing cables were reorganised along the beam line and in small rack underneath the beam line * Patch cables in rack were reorganised * NIM crate (incl. V/f-converters) was moved from floor to the bottom of the rack === Miscellaneous === * Service cupboard has new lock (standard maintenance key) * Cupboard was rearranged, cleaned and refurbished * Tool box from CNAO project available * General office equippment (paper, pens, tape, etc.) * Labelling machine \\ ===== Clean Up December 2012 ===== * Removal of existing detector systems to clear out the area for the beam line upgrade * Removal of unnecessary cables \\ ---- [[fair-rnd:experimental-area-htp:overview|Return to HTP Experiment Setup]]