====== Components at the beam line ====== Besides the detector mechanics and scintillating screen, a camera with lens system and connector box is installed at the beam line. Long cables (copper) lead to the DAQ and PLC systems. ===== Components in the tunnel ===== * The camera with lens system and optical shielding * LED for calibration * Mechanical part including pneumatic drive, viewing ports, etc. * Adapter box If unavoidable, the PLC system for control of the lens system and LED can be mounted in a 19” rack system in the tunnel in radiation protected/reduced areas. ===== Components in the electronics room ===== All components of the SCR DAQ system as well as the required PLC infrastructure should be installed in electronics rooms. They are mounted in 19” rack systems. ===== Cabling ===== ==== GbE Version ==== **Long cables**:\\ 1x halogen free UNITRONIC S/FTP CAT7 LSZH 4x2xAWG23 network cable for camera data Signals\\ 1x halogen free DATAFLAMM-C 5x0.14mm2 between PLC and Adapter box\\ 1x halogen free DATAFLAMM-C PAAR 5x2x0.14mm2 between CPS8 and Adapter box\\ **Short cables**:\\ 1x halogen free DATAFLAMM-C 5x0.14mm2 between Adapter box and lens\\ 1x halogen free DATAFLAMM-C 2x0.14mm2 between Adapter box and LED\\ ==== Radiation-hardened Version ==== **Long cables**:\\ 1x remote head cable, LS0H for camera data Signals\\ 1x halogen free DATAFLAMM-C 5x0.14mm2 between PLC and Adapter box\\ **Short cables**:\\ 1x halogen free DATAFLAMM-C 5x0.14mm2 between Adapter box and lens\\ 1x halogen free DATAFLAMM-C 2x0.14mm2 between Adapter box and LED\\