User Tools

Site Tools


ds:plc:plcinfo2_rpc

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
ds:plc:plcinfo2_rpc [2021/01/19 12:13]
rlonsing
ds:plc:plcinfo2_rpc [2021/01/19 15:02] (current)
rlonsing
Line 53: Line 53:
 Status :\\ Status :\\
  
-11/2020 - the system is still under construction and supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas+11/2020 - System is still under construction and supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas
  
  
-01/2021 - System up and running. All Hardware installed, IO Device ELR aktiv, LSB and YR present but currently disabled (optical fiber connection check)+01/2021 - System up and running. Hardware installation complete, IO Device ELR aktiv, LSB and YR present but currently disabled (optical fiber connection check) 
  
 Liberas: Liberas:
Line 63: Line 64:
  
 {{ :ds:plc:hmi_liberas.jpg?direct&400 |}} {{ :ds:plc:hmi_liberas.jpg?direct&400 |}}
 +\\
 +
 +Libera Rack Location:
 +
 +{{ :ds:plc:libera-rack-belegung.xlsx |}}
 +
 +Libera PLC Output List: 
 +
 +{{ :ds:plc:pinbelegung_ausgang_libera.xlsx |}}
 +
 +RPC PLC IO-Device ELR Pin Layout:
 +
 +{{ :ds:plc:3stockrpc_32klemme_elr_libera.jpg?direct&400 |}}
 +
 +
  
  
ds/plc/plcinfo2_rpc.1611054816.txt.gz · Last modified: 2021/01/19 12:13 by rlonsing