User Tools

Site Tools


ds:plc:plcinfo2_rpc

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
ds:plc:plcinfo2_rpc [2020/11/05 15:39]
rlonsing
ds:plc:plcinfo2_rpc [2021/01/19 15:02] (current)
rlonsing
Line 51: Line 51:
  
  
-Status:\\+Status :\\ 
 + 
 +11/2020 - System is still under construction and supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas 
 + 
 + 
 +01/2021 - System up and running. Hardware installation complete, IO Device ELR aktiv, LSB and YR present but currently disabled (optical fiber connection check) 
 + 
 + 
 +Liberas: 
 + 
 +connected (15) 
 + 
 +{{ :ds:plc:hmi_liberas.jpg?direct&400 |}} 
 +\\ 
 + 
 +Libera Rack Location: 
 + 
 +{{ :ds:plc:libera-rack-belegung.xlsx |}} 
 + 
 +Libera PLC Output List:  
 + 
 +{{ :ds:plc:pinbelegung_ausgang_libera.xlsx |}} 
 + 
 +RPC PLC IO-Device ELR Pin Layout: 
 + 
 +{{ :ds:plc:3stockrpc_32klemme_elr_libera.jpg?direct&400 |}} 
 + 
 + 
 + 
 + 
 + 
 + 
  
-11/2020 the system is still under constructionand supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas 
  
ds/plc/plcinfo2_rpc.1604587141.txt.gz · Last modified: 2020/11/05 15:39 by rlonsing