This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
ds:plc:plcinfo2_rpc [2020/11/05 15:38] rlonsing |
ds:plc:plcinfo2_rpc [2021/01/19 15:02] (current) rlonsing |
||
---|---|---|---|
Line 51: | Line 51: | ||
- | Status:\\ | + | Status :\\ |
+ | |||
+ | 11/2020 - System is still under construction and supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas | ||
+ | |||
+ | |||
+ | 01/2021 - System up and running. Hardware installation complete, IO Device ELR aktiv, LSB and YR present but currently disabled (optical fiber connection check) | ||
+ | |||
+ | |||
+ | Liberas: | ||
+ | |||
+ | connected (15) | ||
+ | |||
+ | {{ : | ||
+ | \\ | ||
+ | |||
+ | Libera Rack Location: | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Libera PLC Output List: | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | RPC PLC IO-Device ELR Pin Layout: | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
- | 11/2020 the system is still under constructionand supposed to be running by 01/2021 for some first RPC tests with a bunch of Liberas | ||