This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
projects:overview [2017/01/27 12:49] marcusschwickert |
projects:overview [2021/04/01 14:04] (current) andreasreiter |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Projects of the BI Department ====== | ====== Projects of the BI Department ====== | ||
- | <font inherit/ | + | ATTENTION: these wiki pages are presently being re-structured! |
* **Internal Projects of BI Teams** | * **Internal Projects of BI Teams** | ||
* **Upgrade Projects of existing GSI Machines ** ( [[: | * **Upgrade Projects of existing GSI Machines ** ( [[: | ||
- | * **FAIR Project** | + | * **FAIR Project** |
- | —- | + | |
- | + | ||
- | ===== BD FAIR project ===== | + | |
- | + | ||
- | [[:fair-bd: | + | |
- | + | ||
- | ===== In-Kind Partners ===== | + | |
- | + | ||
- | [[: | + | |
- | + | ||
- | ===== Compact LEBT ===== | + | |
- | + | ||
- | [[: | + | |
- | + | ||
- | ===== FAIR Labs & Heckhalle ===== | + | |
- | + | ||
- | [[: | + | |
- | + | ||
- | ===== PA-Terminal & Sixfold node ===== | + | |
- | + | ||
- | [[: | + | |
- | + | ||
- | **PA-Terminal**: | + | |
- | + | ||
- | **Six fold node**: This metall box placed close to diagnostic chambers collecs up to 6 single pressure drive control cables to a bigger one that is the connection to the PLC apart from the beamline. It has for each of the possible 6 drives a port for hard wired blocking one of the other drives in case of use of first: Cause diagnostic devices carried by pressured air drives might varry at an experimental accelarator this prevents collisions in one chamber completly seperate from any software or comunnication faults. | + | |
- | + | ||
- | ===== Spill Counter & I/O Controller ===== | + | |
- | + | ||
- | During acceleration in the SIS18, and slow extraction to the HEBT lines and experiment caves as well, the transported and/or lost particles are detected. Proportional pulses, generated by various signal sources (IC, SEM, BLM, collimators) have been processed by the so called " | + | |
- | + | ||
- | ==== Hardware for countable Signals at SIS18 and GSI-High-Energy-branch ==== | + | |
- | + | ||
- | The system called " | + | |
- | + | ||
- | === Stepstone " | + | |
- | + | ||
- | A first step on that way is a unit called " | + | |
- | + | ||
- | [[: | + | |
- | + | ||
- | === New "Count control" | + | |
- | + | ||
- | under construction | + | |
- | + | ||
- | [[: | + | |