User Tools

Site Tools


ds:plc:plcinfo2_rpc

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
ds:plc:plcinfo2_rpc [2021/01/19 12:09]
rlonsing
ds:plc:plcinfo2_rpc [2021/01/19 15:01]
rlonsing
Line 53: Line 53:
 Status :\\ Status :\\
  
-11/2020 - the system is still under construction and supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas+11/2020 - System is still under construction and supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas 
 + 
 + 
 +01/2021 - System up and running. Hardware installation complete, IO Device ELR aktiv, LSB and YR present but currently disabled (optical fiber connection check) 
 + 
 + 
 +Liberas: 
 + 
 +connected (15) 
 + 
 +{{ :ds:plc:hmi_liberas.jpg?direct&400 |}} 
 +\\ 
 + 
 +Libera Rack Location: 
 + 
 +{{ :ds:plc:libera-rack-belegung.xlsx |}} 
 + 
 +Libera PLC Output List:  
 + 
 +{{ :ds:plc:pinbelegung_ausgang_libera.xlsx |}} 
 + 
 +RPC PLC IO-Device ELR Pin Layout: 
 + 
 + 
 + 
  
  
-01/2021 - System up and running. All Hardware installed, IO Device ELR aktiv, LSB and YR present but currently disabled (optical fiber connection check) 
-        - Liberas connected (15) 
  
  
  
ds/plc/plcinfo2_rpc.txt · Last modified: 2021/01/19 15:02 by rlonsing