User Tools

Site Tools


ds:plc:plcinfo2_rpc

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
ds:plc:plcinfo2_rpc [2020/11/05 15:28]
rlonsing
ds:plc:plcinfo2_rpc [2021/01/19 15:01]
rlonsing
Line 4: Line 4:
      
 A PLC system, designed to offer a remote power cycle for a variety of devices.\\  A PLC system, designed to offer a remote power cycle for a variety of devices.\\ 
-Consisting of a HMI and IO-station in the ELR , LSB and YR Container.\\+Consisting of a HMI and an IO-station in the ELR , LSB and YR Container.\\
 IO-stations are connected by optical fiber.\\ IO-stations are connected by optical fiber.\\
-An additional ethernet controller providing a HMI VNC access for the ACC network.\\+An additional ethernet controller (Weidmüller) providing a HMI VNC access for the ACC network.\\
    
    
 **PLC HARDWARE:**\\ **PLC HARDWARE:**\\
  
-Providing IO-Station with 48 digital outputs per station and a HMI touchscreen to control the power cycle of attached devices.+Providing 3x IO-Station with 48 digital each and a HMI touchscreen to control the power cycle of attached devices.
  
  
Line 23: Line 23:
 IO-STATION : (3x)\\ IO-STATION : (3x)\\
 \\ \\
-• SIMATIC ET 200SP -  Profinet adapter\\+• SIMATIC ET 200SP -  profinet adapter\\
 • IM 155-6 PN HF - IO device\\ • IM 155-6 PN HF - IO device\\
 • DQ 8x24VDC/0.5A HF - digital output (2x)\\ • DQ 8x24VDC/0.5A HF - digital output (2x)\\
Line 33: Line 33:
 \\ \\
  
-PLC System Overview:\\+PLC System Overview :\\
  
 {{ :ds:plc:rpc01.jpg?direct&400 |}}\\ {{ :ds:plc:rpc01.jpg?direct&400 |}}\\
 \\ \\
-CPU and CP:\\+CPU and CP :\\
  
 {{ :ds:plc:rpc02.jpg?direct&400 |}}\\ {{ :ds:plc:rpc02.jpg?direct&400 |}}\\
 +
 +\\
 +HMI :\\
 +
 +{{ :ds:plc:rpc03.jpg?direct&400 |}}
 +\\
 +IO-Station (3x) :\\
 +
 +{{ :ds:plc:rpc04.jpg?direct&400 |}}\\
 +
 +
 +Status :\\
 +
 +11/2020 - System is still under construction and supposed to be running by 01/2021 for a first RPC test with a bunch of Liberas
 +
 +
 +01/2021 - System up and running. Hardware installation complete, IO Device ELR aktiv, LSB and YR present but currently disabled (optical fiber connection check)
 +
 +
 +Liberas:
 +
 +connected (15)
 +
 +{{ :ds:plc:hmi_liberas.jpg?direct&400 |}}
 +\\
 +
 +Libera Rack Location:
 +
 +{{ :ds:plc:libera-rack-belegung.xlsx |}}
 +
 +Libera PLC Output List: 
 +
 +{{ :ds:plc:pinbelegung_ausgang_libera.xlsx |}}
 +
 +RPC PLC IO-Device ELR Pin Layout:
 +
 +
 +
 +
 +
 +
  
  
  
ds/plc/plcinfo2_rpc.txt · Last modified: 2021/01/19 15:02 by rlonsing