This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
projects:bdupgrade [2016/02/23 13:41] marcusschwickert [Meeting #1: 23.02.2016] |
projects:bdupgrade [2022/04/13 16:59] (current) marcusschwickert |
||
---|---|---|---|
Line 2: | Line 2: | ||
This page collects all information on the general BD upgrade of the existing GSI facility. | This page collects all information on the general BD upgrade of the existing GSI facility. | ||
- | ... as usual: under construction... | + | Ongoing BEA projects: |
- | Todo list from first meeting with CSCO on " | + | * [[projects:HKR_inj_upgrade|HKR Injector Upgrade]] |
- | + | * [[projects:Alvarez2upgrade|Alvarez2.0 Upgrade]] | |
- | At present various projects and activities require a substantial re-work of the existing BI equipment at GSI. The activities which require support by the BI team are: | + | |
- | * Agenda 2017 / Control System Retrofit by CSCO department | + | |
- | * GaF: GSI-Anbindung an FAIR project with implications on SIS18 installations | + | |
- | * The results of the FC2WG team (FAIR Controls and Commissioning Working Group) | + | |
- | * Requirements presented during the HIC4FAIR Workshop in Hamburg | + | |
- | + | ||
- | ====== Beam Instrumentation DAQ Upgrade and Control System Retrofit ====== | + | |
- | Starting in Feb. 2016 a sequence of bi-weekly project meetings has been set up in order to organize and prepare for the required upgrade of diagnostic devices.\\ | + | |
- | The working title of the project is for time being: **BIDUCOR** (**B**eam **I**nstrumentation **D**ata acquisition **U**pgrade and **CO**ntrol system **R**etrofit).\\ | + | |
- | Apart from the preparation of presentations and meeting minutes the goal of the meetings is to collocate information on the various diagnostic systems and to generate a central document containing all relevant technical information about the required upgrade measures. At the moment it is foreseen to create two documents, one for BIDUCOR-SIS18 and one for BIDUCOR-HEST. | + | |
- | ===== Meeting #1: 23.02.2016 ===== | + | |
- | Participants: | + | |
- | {{: | + | |
- | + | ||
- | ==== Summary ==== | + | |
- | * MSchw presented the main goals for setting up this new project. | + | |
- | * The various requirements from CSCO, FC2WG (R. Steinhagen) and LOBI regarding an upgrade of BI devices in 2016-2018 were discussed. | + | |
- | * Technically, | + | |
- | * It was agreed to schedule the next meeting in 2 weeks, to proceed with the brain storming about SIS18 components. | + | |
- | * In the upcoming meetings the upgrade of HEST components will be treated as well. | + | |
- | ==== Action Items ==== | + | |
- | * prepare information on SIS18 BI systems not discussed so far: Tune, Schottky, SPEKY, SIS-Radio, TOPOS, Screen, Profile grid | + | |
- | * further elaborate on the open questions addressed in the presentation | + | |
+ | This page is updated only on sparse intervals. Thus, information presented here is, unfortunately, | ||
+ | A collection of BEA projects in the past can be found here: [[projects: | ||