User Tools

Site Tools


projects:bdupgrade

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projects:bdupgrade [2016/02/23 13:41]
marcusschwickert [Meeting #1: 23.02.2016]
projects:bdupgrade [2022/04/13 16:59] (current)
marcusschwickert
Line 2: Line 2:
 This page collects all information on the general BD upgrade of the existing GSI facility. This page collects all information on the general BD upgrade of the existing GSI facility.
  
-... as usualunder construction...+Ongoing BEA projects:
  
-Todo list from first meeting with CSCO on "Agenda 2017" (11 May 2015): {{:projects:todoliste_agenda2017_sitzung_11mai2015.docx|todo list}} +  * [[projects:HKR_inj_upgrade|HKR Injector Upgrade]] 
- +  * [[projects:Alvarez2upgrade|Alvarez2.0 Upgrade]]
-At present various projects and activities require a substantial re-work of the existing BI equipment at GSI. The activities which require support by the BI team are: +
-  * Agenda 2017 / Control System Retrofit by CSCO department +
-  * GaF: GSI-Anbindung an FAIR project with implications on SIS18 installations +
-  * The results of the FC2WG team (FAIR Controls and Commissioning Working Group) +
-  * Requirements presented during the HIC4FAIR Workshop in Hamburg [[https://indico.gsi.de/conferenceDisplay.py?ovw=True&confId=3368]] +
-  +
-====== Beam Instrumentation DAQ Upgrade and Control System Retrofit ====== +
-Starting in Feb. 2016 a sequence of bi-weekly project meetings has been set up in order to organize and prepare for the required upgrade of diagnostic devices.\\ +
-The working title of the project is for time being: **BIDUCOR** (**B**eam **I**nstrumentation **D**ata acquisition **U**pgrade and **CO**ntrol system **R**etrofit).\\ +
-Apart from the preparation of presentations and meeting minutes the goal of the meetings is to collocate information on the various diagnostic systems and to generate a central document containing all relevant technical information about the required upgrade measures. At the moment it is foreseen to create two documents, one for BIDUCOR-SIS18 and one for BIDUCOR-HEST. +
-===== Meeting #1: 23.02.2016 ===== +
-Participants: HR, BWH, AR, PK, TG, TH, OC, MSchw\\ +
-{{:projects:meeting_retrofit_sis18_20160223.pdf|presentation slides with comments}} +
- +
-==== Summary ==== +
-  * MSchw presented the main goals for setting up this new project. +
-  * The various requirements from CSCO, FC2WG (R. Steinhagen) and LOBI regarding an upgrade of BI devices in 2016-2018 were discussed. +
-  * Technically, the meeting focused on the BI systems DCT, FCT and LASSIE (see remarks added to the presentation) +
-  * It was agreed to schedule the next meeting in 2 weeks, to proceed with the brain storming about SIS18 components. +
-  * In the upcoming meetings the upgrade of HEST components will be treated as well. +
-==== Action Items ==== +
-  * prepare information on SIS18 BI systems not discussed so far: Tune, Schottky, SPEKY, SIS-Radio, TOPOS, Screen, Profile grid +
-  * further elaborate on the open questions addressed in the presentation+
  
 +This page is updated only on sparse intervals. Thus, information presented here is, unfortunately, often outdated.
 +A collection of BEA projects in the past can be found here: [[projects:pastBIprojects|Collection of past projects]]
  