User Tools

Site Tools


projects:bdupgrade

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
projects:bdupgrade [2016/02/23 11:39]
marcusschwickert
projects:bdupgrade [2022/04/13 16:59] (current)
marcusschwickert
Line 1: Line 1:
-====== BD Upgrade ======+====== Beam Instrumentation Upgrade Projects ======
 This page collects all information on the general BD upgrade of the existing GSI facility. This page collects all information on the general BD upgrade of the existing GSI facility.
  
-... as usualunder construction...+Ongoing BEA projects:
  
-Todo list from first meeting with CSCO on "Agenda 2017" (11 May 2015): {{:projects:todoliste_agenda2017_sitzung_11mai2015.docx|todo list}} +  * [[projects:HKR_inj_upgrade|HKR Injector Upgrade]] 
- +  [[projects:Alvarez2upgrade|Alvarez2.0 Upgrade]]
-====== Beam Instrumentation DAQ Upgrade and Control System Retrofit ====== +
-Starting in Feb. 2016 a sequence of bi-weekly project meetings has been set up in order to organize and prepare for the required upgrade of diagnostic devices.\\ +
-The working title of the project is for time being: BIDUCOR (**B**eam **I**nstrumentation **D**ata acquisition **U**pgrade and **CO**ntrol system **R**etrofit).\\ +
- +
-===== Meeting #1: 23.02.2016 ===== +
-Participants: HR, BWH, AR, PK, TG, TH, OC, MSchw +
-{{:projects:meeting_retrofit_sis18_20160223.pdf|presentation slides with comments}} +
-It was agreed to schedule the next meeting in 2 weeks, to proceed with the brain storming about SIS18 components. \\ +
-As a next step HEST components will be treated as well+
  
 +This page is updated only on sparse intervals. Thus, information presented here is, unfortunately, often outdated.
 +A collection of BEA projects in the past can be found here: [[projects:pastBIprojects|Collection of past projects]]
  
projects/bdupgrade.1456223948.txt.gz · Last modified: 2016/02/23 11:39 by marcusschwickert