User Tools

Site Tools


ds:projects:projects

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
ds:projects:projects [2017/06/06 11:50]
haraldbraeuning
ds:projects:projects [2021/09/16 18:38] (current)
tobiashoffmann
Line 7: Line 7:
 Lassie (Large Analog Signal and Scaler Information Environment) is the FESA based successor to [[projects:ablass:overview|Ablass]]. Lassie (Large Analog Signal and Scaler Information Environment) is the FESA based successor to [[projects:ablass:overview|Ablass]].
  
-[[projects:beamview:overview|BeamView]] \\+[[projects:beamview:overview|BeamView (Scintillating Screens) and ProfileView (BIF)]] \\
 A system to view images of scintillator screens or beam induced fluerescence monitors via FireWire/GigE cameras.  A system to view images of scintillator screens or beam induced fluerescence monitors via FireWire/GigE cameras. 
 +
 +[[:data_acquisition_hardware|CUPID]] \\
 +The FAIR/GSI scintillation screen DAQ system in microTCA.
  
 [[ds:private:bsm|Bunch Struktur Monitor]] \\ [[ds:private:bsm|Bunch Struktur Monitor]] \\
Line 17: Line 20:
 Upgrade project of the existing Fesa 2.10 PLC control to Fesa 3.0 and IEPLC Upgrade project of the existing Fesa 2.10 PLC control to Fesa 3.0 and IEPLC
  
-[[ds:projects:cryring:cryring|CryRing DAQ]]\\+[[ds:projects:cryring|CryRing DAQ]]\\
  
-[[fair-bd:daq:projects:steppermotor:overview|Stepper Motors for Beam Diagnostics Devices]]\\+[[ds:projects:rt_hebt|Resonant Transformer for FAIR HEBT]]\\
  
-[[fair-bd:daq:projects:rt_fct_hebt:overview|Resonant & Fast Current Transformer for HEBT]]\\+[[ds:projects:fct_hebt|Fast Current Transformer for FAIR HEBT]]\\ 
 + 
 +[[fair-bd:daq:projects:steppermotor:overview|Stepper Motors for Beam Diagnostics Devices]]\\
  
 [[fair-bd:daq:projects:fct_sis18:overview|Fast Current Transformer for SIS18]]\\ [[fair-bd:daq:projects:fct_sis18:overview|Fast Current Transformer for SIS18]]\\
Line 33: Line 38:
 [[ds:projects:retrofit:transformers|Retrofit2018 for ACTs and DCTs at TK, SIS18 and ESR]] [[ds:projects:retrofit:transformers|Retrofit2018 for ACTs and DCTs at TK, SIS18 and ESR]]
  
 +[[ds:projects:poland|Poland Software and Fesaclass info]]
  
 +[[ds:projects:unimon|UNILAC tank signal monitor (UNIMON)]]\\
  
 +[[ds:projects:MAPS|Macro Pulse Selector (MAPS@UNILAC)]]\\
  
ds/projects/projects.1496742632.txt.gz · Last modified: 2017/06/06 11:50 by haraldbraeuning