User Tools

Site Tools


ds:projects:maps

This is an old revision of the document!


MAPS - The Macro Pulse Selector @ UNILAC 2022

Project Plan:

Total renovation of the old MAPS system. Replacement of all old DAQ hardware and measurement concepts. All transformer signals will be digitized in parallel.

For this following hardware will be used:

Up to five setups of:

  • 2U MTCA system with AM G64 CPU
  • TAMC532 32 Channel ADC with RTM
  • 2 x SIS8864 I/O Modules
  • Fair Timing Receiver Node (FTRN)
ds/projects/maps.1631811428.txt.gz · Last modified: 2021/09/16 18:57 by tobiashoffmann