Pictures 2012
Original information compiled by F. Becker
Actual Status
Installation of an extractor gauge with controller
Direkt Link to the gauge controller
http://sddev062.gsi.de
Installation of the new rack for the pumping station
Bif Shielding and Support Frame is Ready
Order No. MEWE 10071 - 2012|10|11
CATIA drawing No. SU-1001094-A-000
Return to HTP Experiment Setup