====== Pictures 2012 ====== Original information compiled by F. Becker \\ ===== Actual Status ===== === Installation of an extractor gauge with controller === * ** Direkt Link to the gauge controller [[http://sddev062.gsi.de]]** {{:fair-rnd:experimental-area-htp:2012-03-12-086.jpg?600|}} {{:fair-rnd:experimental-area-htp:2012-03-12-088.jpg?600|}} ---- \\ === Installation of the new rack for the pumping station === {{:fair-rnd:experimental-area-htp:2012-03-14-095.jpg?194|}}{{:fair-rnd:experimental-area-htp:2012-03-14-092.jpg?194|}}{{:fair-rnd:experimental-area-htp:2012-03-14-091.jpg?194|}} ---- \\ === Bif Shielding and Support Frame is Ready === * **Order No. MEWE 10071 - 2012|10|11** * **CATIA drawing No. SU-1001094-A-000** {{:fair-rnd:experimental-area-htp:2012-03-07-059.jpg?300|}}{{:fair-rnd:experimental-area-htp:2012-03-07-070.jpg?300|}} {{:fair-rnd:experimental-area-htp:shielding-stand-on-roof.jpg?600|}} \\ ---- [[fair-rnd:experimental-area-htp:overview|Return to HTP Experiment Setup]]