====== Schematic Drawings of HTP Area ====== === Existing beam line (up to June 2013) === {{:fair-rnd:experimental-area-htp:gesamtansicht_htp_htb_15.05.12.catdrawing.pdf|Beam line drawing K. Gütlich}} === Proposal for upgraded beam line (2nd July 2013) === The image below shows the detector setup for the 2014 measurement series. Not shown are in-air experiment setups like the sctintillating screen target ladder and two vertical actuators (pneumatic drive and stepper motor drive) with air ionisation chamber or multi-wire chamber. \\ {{:fair-rnd:experimental-area-htp:htp_updateproposal_detectorconfiguration.png?500|Proposed detector configuration}} {{:fair-rnd:experimental-area-htp:std-v01-l38.000.000_strahlstrecke_htp_13-07-01.pdf|Proposal C. Dorn, 1st July 2013}}\\ {{:fair-rnd:experimental-area-htp:htp_strahlfuehrung_stand_13-10-21.pdf|Proposal C. Dorn, 21st Oct. 2013)}} Possible detector configurations for the FAIR HEBT chamber (type 3): |TOP |SCR | |LEFT |SEM-Grid | |RIGHT |MWPC/IC/SEM combination or OTR | |45° port|PDC (Scintillator) or other position-insensitive detectors \\ Note: position interlock required with right port | The chamber HTPDK1 is equipped with: * HTPDI1P: Plastic scintillator * HTPDI1I: Ionisation chamber * HTPDI1S: SEM * HTPDG1G: MWPC