This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
projects:pastbiprojects [2022/04/13 16:53] marcusschwickert |
projects:pastbiprojects [2022/04/13 16:56] (current) marcusschwickert [Collection of BI Past BI Projects] |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Collection of BI Past BI Projects ====== | + | ====== Collection of BI Projects |
===== Years 2015 - 2016 ===== | ===== Years 2015 - 2016 ===== | ||
Line 12: | Line 12: | ||
* Requirements presented during the HIC4FAIR Workshop in Hamburg [[https:// | * Requirements presented during the HIC4FAIR Workshop in Hamburg [[https:// | ||
- | ====== Beam Instrumentation DAQ Upgrade and Control System Retrofit | + | ==== Beam Instrumentation DAQ Upgrade and Control System Retrofit ==== |
Starting in Feb. 2016 a sequence of bi-weekly project meetings has been set up in order to organize and prepare for the required upgrade of diagnostic devices.\\ | Starting in Feb. 2016 a sequence of bi-weekly project meetings has been set up in order to organize and prepare for the required upgrade of diagnostic devices.\\ | ||
The working title of the project is for time being: **BIDUCOR** (**B**eam **I**nstrumentation **D**ata acquisition **U**pgrade and **CO**ntrol system **R**etrofit).\\ | The working title of the project is for time being: **BIDUCOR** (**B**eam **I**nstrumentation **D**ata acquisition **U**pgrade and **CO**ntrol system **R**etrofit).\\ |