This shows you the differences between two versions of the page.
fair-rnd:rnd-projects:fluka-simulations:overview [2011/11/24 15:49] frank created |
fair-rnd:rnd-projects:fluka-simulations:overview [2011/11/24 15:50] (current) frank |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Simulations for SIS100/ | + | ====== |
+ | |||
+ | In collaboration with Sanja Damjanovic from DGS/ | ||
+ | we will address important issues of radiation protection and the\\ | ||
+ | appropriate shielding of BD-components. | ||
+ | |||
+ | General tasks of this project are: | ||
+ | |||
+ | * verify, if planned sensors are applicable at given installation locations | ||
+ | * define and optimize radiation shields | ||
+ | * check the concept of SIS100 | ||
+ | * estimate the particle flux at locations in SIS100 and HEBT to qualify foreseen beam-loss monitors | ||
+ | * sequential work on projects 1-3 is proposed to pin down radiation requirements for BD-equipment | ||
+ | |||
+ | \\ | ||
+ | |||
+ | ==== Project 1: Shielding optimization for BIF-Monitors ==== | ||
+ | |||
+ | * **Goals: | ||
+ | - Estimate the particle flux/species at BIF locations | ||
+ | - Qualify different shielding scenarios (e.g. sandwich materials) | ||
+ | * FLUKA input files (geometry) and preliminary simulations available | ||
+ | * Simulation results will be compared to GSI-HEBT data | ||
+ | * Important input for final beam diagnostic layout / selection of detector setup | ||
+ | * for details please navigate to [[fair-rnd: | ||
+ | * Responsible: | ||
+ | \\ | ||
+ | ---- | ||
+ | \\ | ||
+ | ==== Project 2: Simulations for SIS100 electronic niches | ||
+ | |||
+ | * **Goals: | ||
+ | - Generate FLUKA input for SIS100 tunnel | ||
+ | - Estimate the particle flux/ | ||
+ | - Qualify foreseen radiation shields of niches and electronic devices | ||
+ | * Geometry of niches and SIS100 tunnel (building, accelerator equipment) will be provided | ||
+ | * Comparison of simulation results with CERN limit of 200 kGy/yr | ||
+ | * Optimization of shielding concept, cable trays, air cooling etc. | ||
+ | * Requirements specification for rad-hard electronics | ||
+ | * for details please navigate to [[fair-rnd: | ||
+ | * Responsible: | ||
+ | |||
+ | |||
+ | \\ | ||
+ | ---- | ||
+ | \\ | ||
+ | ==== Project 3: Simulations for SIS100/HEBT BLMs ==== | ||
+ | |||
+ | * **Goals:** | ||
+ | - Generate FLUKA input for primary loss locations in SIS100 tunnel and HEBT | ||
+ | - Estimate the particle flux/ | ||
+ | - Qualify BLM detector types for age at given locations | ||
+ | * Geometry of SIS100 tunnel, beam lines, magnets, shieldings will be provided | ||
+ | * Calculate particle species, flux, energy deposition for different operational scenarios | ||
+ | * Estimate detector response of scintillators/ | ||
+ | * Compare results with CERN data for LHC-BLMs | ||
+ | * for details please navigate to [[fair-rnd: | ||
+ | * Responsible: | ||
+ | \\ | ||