This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
projects:overview [2017/01/27 12:56] marcusschwickert [Projects of the BI Department] |
projects:overview [2020/01/08 14:25] cpiromalli |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Projects of the BI Department ====== | ====== Projects of the BI Department ====== | ||
- | <font inherit/ | + | ATTENTION: these wiki pages are presently being re-structured! |
* **Internal Projects of BI Teams** | * **Internal Projects of BI Teams** | ||
* **Upgrade Projects of existing GSI Machines ** ( [[: | * **Upgrade Projects of existing GSI Machines ** ( [[: | ||
* **FAIR Project** | * **FAIR Project** | ||
- | —- | ||
- | |||
- | ===== BD FAIR project ===== | ||
- | |||
- | [[: | ||
- | |||
- | ===== In-Kind Partners ===== | ||
- | |||
- | [[: | ||
- | |||
- | ===== Compact LEBT ===== | ||
- | |||
- | [[: | ||
- | |||
- | ===== FAIR Labs & Heckhalle ===== | ||
- | |||
- | [[: | ||
- | |||
- | ===== PA-Terminal & Sixfold node ===== | ||
- | |||
- | [[: | ||
- | |||
- | **PA-Terminal**: | ||
- | |||
- | **Six fold node**: This metall box placed close to diagnostic chambers collecs up to 6 single pressure drive control cables to a bigger one that is the connection to the PLC apart from the beamline. It has for each of the possible 6 drives a port for hard wired blocking one of the other drives in case of use of first: Cause diagnostic devices carried by pressured air drives might varry at an experimental accelarator this prevents collisions in one chamber completly seperate from any software or comunnication faults. | ||
- | |||
- | ===== Spill Counter & I/O Controller ===== | ||
- | |||
- | During acceleration in the SIS18, and slow extraction to the HEBT lines and experiment caves as well, the transported and/or lost particles are detected. Proportional pulses, generated by various signal sources (IC, SEM, BLM, collimators) have been processed by the so called " | ||
- | |||
- | ==== Hardware for countable Signals at SIS18 and GSI-High-Energy-branch ==== | ||
- | |||
- | The system called " | ||
- | |||
- | === Stepstone " | ||
- | |||
- | A first step on that way is a unit called " | ||
- | |||
- | [[: | ||
- | |||
- | === New "Count control" | ||
- | |||
- | under construction | ||
- | |||
- | [[: | ||